Tricel NOVOUK6 - 6 Person Sewage Treatment Plant

Tricel NOVOUK6 – 6 Person Sewage Treatment Plant

NOVO6UK
Tricel Novo wastewater treatment plants are reliable, easy to install and simple to maintain for all wastewater requirements. The Tricel Novo submerged aeration plant is suitable for domestic and light commercial or communal applications and uses simple proven fixed bed technology. Each system comprises of 3 independent treatment zones, all fulfilling a different stage of the purification process. Choosing the right sewage treatment plant is important, as in the case of a property alteration or extension, Building Control will strongly advise for a plant which is suitable for handling the increased flows and loads of the new development.

£2,299.00 ex. VAT

Tricel Novo System:

Tricel Novo Risers:

Compression moulded SMC tank. The compression moulding process is one the most technologically developed processes available to manufacture structural composites. Components are manufactured under heat and high pressure and have unrivalled strength and durability over standard GRP tanks or Polyethylene tanks. SMC is unique in the waste water treatment industry with Tricel SMC tanks operating in some of the harshest climatic conditions for over 50 years with no defects. Tricel’s ceramic diffuser is unique in the domestic wastewater treatment plant market and will last twice as long as all standard competitors rubber equivalents. This saves money in both call out fees and replacement parts. No concrete backfill for installation on most sites saving up to £300 over lower quality GRP or Polyethylene alternatives from competitors. Complies with Environment Agency General Binding Rules in England, Natural Resources Wales exemption criteria and SEPA requirements. Tricel advise consulting with your local agency on the level of effluent treatment required. No moving parts or pumps in the plant ensuring reliable operation and minimal maintenance and repair costs. Factory Fitted Alarm on all systems. Integrated pumped outlet available on all systems.

How a Tricel Novo Works:

Stage 1:

The Primary Settlement Chamber

In the first stage of sewage treatment, anaerobic breakdown takes place in the primary settlement chamber. The wastewater is introduced and the solids drop to the bottom, becoming separated from the liquid.

Stage 2:

The Aeration Chamber

The next stage of the wastewater treatment involves aerobic breakdown. This takes place in the aeration chamber, where masses of naturally occurring bacteria inhabit specially designed filter media.

These bacteria are sustained with air, which is continuously supplied from a purpose-built pump in the unit’s top section. As the liquid flows slowly through the filter media, the bacteria feed on the waste and remove it from the liquid.

Stage 3:

Final Settlement Chamber

In the last stage of wastewater treatment, the liquid flows from the aeration chamber into the final settlement chamber. Suspended sludge consisting of bacteria is carried with the liquid into the settlement chamber and settles to the bottom of the chamber.

From there, a continuous sludge return system pumps it back to the primary settlement chamber. The remaining treated liquid now meets the required standard to be safely passed out of the Tricel system.

Other Sewage Treatment Plants

Tricel NOVOUK6GSR – 6 Person Economy Sewage Treatment Plant
£2,057.00 ex. VAT
The Tricel Novo 6GSR is an economy version of the...
Tricel NOVOUK8GSR – 8 Person Economy Sewage Treatment Plant
£2,245.10 ex. VAT
The Tricel Novo 8GSR is an economy version of the...
Tricel NOVOUK6 – 6 Person Sewage Treatment Plant
£2,299.00 ex. VAT
Tricel Novo wastewater treatment plants are reliable, easy to install...